Dress with crochet hearts. Summer female crochet dress from Red Heart. Large pearl pattern

Facial rows - facial loops, invalible rows - invalous loops.

Painted smooth

Facial rows - invalous loops, invalible rows - facial loops.

Edge Border "Shell"

In the 1st p. The number of loops should be even, in the 2nd p. The number of loops should be multiple 5.

1st r. \u003d Facial Row: * Related on the needles and crochet canvases to take together and through both web to dial 10 tight loops to the needle. To remove the knitting needle, the working thread to stretch through 10 loops \u003d 1 loop, stretch the thread tighten so that the semicircle formed. The hook remove these loops to the needle, in addition, enter the needle in the last loop of the semicircle and put this loop too to the needle \u003d 2 loops. From * to repeat constantly.

2nd r. \u003d Pour row: * Knit only with a spoke 1 Innoise, 3 loops dial additionally, as described above, 1 Pouring \u003d 5 p. For each arc, from * constantly repeat.

Large pearl pattern

Alternately 1 facial, 1 wrong, pattern shift to 1 p. In each 2nd (circle) p.

Openwork pattern

Knit according to the scheme A. Loops to distribute according to the instructions. 1-12th r. Slit 1 time, then constantly repeat the 3-12 p. In the wrong rows, the hinges are sticking together to knit by involnery, other loops and nakids are facial.

Motive "Heart"

Knit according to scheme V. 1-36th r. Check 1 time. In the wrong rows of hinges knit in the drawing. Pay attention: 36th r. \u003d Pouring row in the diagram. The number of loops inside the rapport changes.

Knitting density

23 p. X 29 r. \u003d 10 x 10 cm, associated with a large pearl pattern;
39 p. X 29 r. \u003d 17 x 10 cm, connected with the motive "heart";
17 p. X 20 r., Is associated with an openwork pattern A;
7.5 x 29 cm, linked in the openwork pattern in;
4.5 Arches of the curb "Shell" \u003d 10 cm in width.

Attention!

The measurements on the pattern are given without me 2 p. edge border.

Pattern


Completing of the work

Back

Perform 24 (26) 28 (30) Arches of the border "Shell", as described \u003d 120 (130) 140 (150) p. After the 2nd p.

Next, to knit as follows, while uniformly distributed, add 3 p. \u003d 123 (133) 143 (153) P.: 1 Krom., 9 (14) 19 (24) n. Large pearl pattern, 5 p. Facular stub , 17 p. Openwork pattern, 5 p. Facial stroit, * 5 p. Large pearl pattern, 17 p. Openwork pattern, from * Repeat 2 times, 5 p. Large pearl pattern, 5 p. Facial stroy, 17 p. Other Patterns, 5 p. Facial stroy, 9 (14) 19 (24) n. Large pearl pattern, 1 chrome.

For side beams in the 11th p. From the beginning of the patterns on both sides, donate 1 x 1 p., then refund in every 10th p. 10 x 1 p. And in every 8th p. 2 x 1 p. \u003d 97 (107) 117 (127) p.

At the same time after 49 cm \u003d 142 p. From the beginning of the patterns, continue to knite on the middle 39 p. a large pearl pattern, while tracing the strip of the pattern on the left and right to be the same.

After 3.5 cm \u003d 10 p. Spent on these 39 p. 10 p. Announcement, then in the middle to penetrate 36 p. Motive "Heart" and further 10 p. Wrong stroke.

After that, again penetrate 3.5 cm \u003d 10 p. Large pearl pattern.

After 12 p. Openwork bands knit on both of these stripes with an invalid stroke.

9.5 cm \u003d 28 p. From the beginning of the last openwork pattern, it is temporarily left for a neck a middle 39 p. And first finish the left side.

On the indoor edge of the neck, close for the roundabout in the next 2nd p. 1 x 1 p. \u003d 28 (33) 38 (43) p.

After 3 cm \u003d 10 p. From the beginning of the neck, close the rest of the loops.

Before

Knit, as a back, but for a deeper neck, it is temporarily left after 7 cm \u003d 20 p. From the beginning of the last openwork pattern, the average 31 p. And first finish the left side.

By the inner edge for the roar of the neck, close in each 2nd row of 5 x 1 p.

The other side is finished symmetrically.

Sleeve

Run 9 (10) 11 (12) Arches for curb \u003d 45 (50) 55 (60) p. After the 2nd p.

Next, to be knitted as follows, while simultaneously, uniformly distributed, add 2 (3) 2 (3) p. \u003d 47 (53) 57 (63) P: 1 Kr., 3 p. Large pearl pattern, 17 p. Other Pattern, 5 p. Large pearl pattern, 17 p. Openwork pattern, 3 p. Great pearl pattern, 1 chrome. (1 chr., 1 p. Facial stroit, 5 p. Large pearl pattern, 17 p. Openwork pattern, 5 p. Large pearl pattern, 17 p. Openwork pattern, 5 p. Large pearl pattern, 1 p. Facial stroit, 1 chrome. - 1 chr., 3 p. Facial stroit, 5 p. Large pearl pattern, 17 p. Openwork pattern, 5 p. Large pearl pattern, 17 p. Openwork pattern, 5 p. Large pearl pattern, 3 p. facechair, 1 chr.) 1 chr., 1 p. Great pearl pattern, 5 p. Facial stroit, 5 p. Large pearl pattern, 17 p. openwork pattern, 5 p. Large pearl pattern, 17 p. Openwork pattern, 5 p. Large pearl pattern, 5 p. Facial stroit, 1 p. Large pearl pattern, 1 chrome.

For the bevels, add on both sides from the beginning of the patterns in 9 (9) 7 (7) -m. 1 x 1 p., Then add in every 8th p. 9 x 1 p. And in each 6th row of 7 x 1 p. (In each 6th p. 18 x 1 p.) In each 6th p. 11 x 1 p. And in each 4th p. 10 x 1 p. (In each 6th p. 4 x 1 p. And in each 4th p. 19 x 1 p.) \u003d 81 (91) 101 (111) p., At the same time on both sides of the openwork The pattern alternately knit on the added loop of the strip on the 5 p. Large pearl pattern and 5 p. Facial stroit.

After 44.5 (42.5) 40.5 (38.5) cm \u003d 129 (123) 117 (111) p. From the beginning of the patterns, close all the loops.

Assembly

Perform shoulder seams.

On the circular spokes to translate along the edge of the neck of the backs left 39 p., To type 20 p., Then remove the left 31 p. The neck of the transfer and once again to dial 20 p., Close to the ring \u003d 110 p. Slit 6 circular . Large pearl pattern. Then sew all loops.

Perform side seams and seams of sleeves. Insert the sleeves.

The famous designer dress from Brazil Vanessa Montoro. Its dresses are distinguished by an unusual design and lace pattern. The designer's payments resemble a vintage style, very often they are made of natural silk.

Talented needlewomen picked up the scheme in the drawing

Material: 100% silk reels, 3000m per 100g, color cream, hook number 2


Dress knit loose, in order not to "score" pattern.

The first scheme:

Scheme Second:

Motive. associated with this scheme:


Connection of motifs in the canvas:

Third scheme:

The main motive can be associated according to such a scheme:

Master class, how to tie such a "heart" motif:

Dial the chain of 9 air loops, close it in the ring, then score another 55 air loops, the last 9 closure to the ring.

In the first row, in the rings from the air loops, to check the 19 columns with an attachment, on the chain of the loops to check into each loop on one column with an attachment, only in 23 and 24 loops of the chain to check three columns with an attachment. Next continue to knit according to the scheme.

Dress from Vanessa Montoro, master class from Kulban Oksana

Dress in white color:

SCHEMES:

basic Motive Width 11cm

For coquetki need 8 hearts.

For the bottom of the dress from the coquette, you need to:

1st band (from hearts) - 8 motifs, 2nd strip - 7 motifs, 3rd strip - 8 motifs, 4th and all of the following stripes - 9 motifs.

In the coquette and mostly canvas connected the motifs in this way:


Connection of pico in the coquette. The first pico of the connection: Knit 2VP, remove the hook from the loop, insert the hook to the pico to which you need to connect (with the front string), then pick up the removed loop and stretch through the pico; Adjust 2 VP and end the pico attached motive.

Second pico to attach the first one; Third Pico: Knit 1 VP, then tie a column with an attachment in Pico to the joined motive (enter the pico crochet with an inside), then peck 1 VP and finish the pico attached motive.

Scheme of the coquette pattern (between hearts)

Connection diagram strips:

Rolf scheme (Ryush):

The connection of the bands, when moving from more motifs to a smaller:

The connection of the bands, when moving from a smaller number of motifs to more:

The central motives are transferred to combine unchanged, in order to not disturb the aesthetic view of the location of motifs in a checker order.

Every modnica wants to shine a unique outfit, needlewomen - no exception. If you knit for yourself or to order, we suggest you tie a crochet dress. What will it be for and for whom it depends only on you.

There is a desire? Do your eyes burn? Hands ready to work? But you do not know where to start? First of all it is necessary to decide: what time you or your client will wear a crochet dress.

Yes, crocheted dresses from cashmere or acrylic can be comfortably wearing in winter under the layer of the outerwear, but after all, and in warm time I want to demonstrate a knitted product.

Selection of yarn

For summer models, it is better to choose a natural yarn.

A thin yarn is suitable, the main component of which is cotton or bamboo fiber. Additional properties of the product will give microfiber, acrylic, lycra or viscose present in the thread.
The models of crochet dresses with openwork elements in the waist area, neckline or contour of the product are very impressive.

The base of the dresses is crocheted number 1, 2 or 3. The opening of the elements is achieved by applying a larger hook or the inclusion of elements with a large number of air loops.

If you are a novice, you can link a children's summer sundress or a straight model dress assembled on a row or belt. Such a dress does not need to make patterns and tight fit in the figure.

There are many models of incredibly feminine dresses that are suitable for both the solemn evening and for a romantic date. Crochet dresses most often get light and openwork. But this is logical, for the hook, most of the aircraft and summer patterns. The most chic is the crochet-knit dress in the technique of Irish lace. Only the most experienced craftswomen will take care of the creation of such a masterpiece.

What yarn to choose for a warm knitted crochet dresses?

For knitting crochet, designed for wearing in a cold period, a thicker yarn is suitable. The warmeters will be products associated from yarn, which is at least 50% consisting of wool. But be careful if the wool in the thread composition of 70% and more product can turn out to be prickly. Choose imported yarn or merino so that the wool is soft.

The presence of acrylic in such a yarn makes the knitted dress soft, air and volumetric. Even in the coldest winter evening you will be cozy in it.
Knit such a product is better than hooks thoroughly, number 4 or 5.

To this day, the model of the winter dress, which is like a sweater with a high collar-clamp and a length of the hip or slightly above the knee looks quite popular.

Crochet dress, models of our needlewomen

My embodiment of a sewer work. For a long time I dreamed of embodying a spit-knitted model! Dreams Come True! And not just mine! I thank Olenka for ordering such an interesting thing. While he worked the name was not interested, but after the photo shoot came by itself!

Dress "Spring" is associated with a crochet 1.7 of the yarn of 100% cotton "Tamara" gentle pistachio color. To expand the skirt changed hooks for large sizes, in the process of knitting. The dress is very gentle, the openwork looks very impressive in the product. Bottom

The dress is connected from the Semenov yarn of Softness 400 m. - 100 gr. 47% cotton, 53% viscose, hook No. 1.5. And Tulip Yarnart yarn 250 m.-50 gr. Very comfortable in summer heat, on the beach or for a celebration or as

The dress is connected from very silky pleasant to the body of yarn Tulip Yarnart 250 M.-50 gr. Hook No. 1.25. Very comfortable and cooler in a summer heat dress. Related by columns with Nakud. Scheme of ajurov attached. Happy viewing. Detailed description

Dress "Feather birds" is connected from the yarn "Violett" for the daughter-in-law of 46 size. This is my first experience of knitting dresses not by motifs. Dissected many times, because I was mistaken, but still mastered. Photos of good quality did not wait, lay out

The dress on the 62 size is made in the filleic knitting technique of 100% minerized cotton "Pelican", a hook of 1.5 mm was used, the yarn flow is 600 grams, the pattern of the pattern on the sleeves and on the corners of the dress are taken by fragments from the main scheme. Work

The dress is made in the technique of elemental lace from 100% minerized cotton "Anna -16". Used hooks 1 mm., 1.25 mm., 1.5 mm. Dress for size 50-52, yarn flow 650 grams. Dress knitting diagrams:

The dress "Pearl of a bouquet" is connected in the technique of Irish lace in theory of Olga Anastasia. The yarn is 100% cotton "Violet", "Filo Di Socoty 16", "Princess" 100% viscose (middle of daisies). Turkey production yarn. Description of the dresses First, the dress pattern is made, attached on the tablet (from

The dress in the floor of the color of the gentle mint is made in the technique of fillet knitting. Size 46-48-50. The length of the product is 125 cm. Yarn is a 100% viscose. Hook №0.9. The product has little thing, has a matte shine. Dress knitting diagrams:

Dress "Provence". Size 46-48. The dress is made in the filleic technique, connected from the mixture thread, 50/50 cotton with acrylic, consumption 400 gr, 800 m in 100 gr, hook 1.7. Before starting knitting, be sure to make a sample, sip and make

The dress "Anthony" based on Vanessa Montoro in my execution a short option. Related from Mercerized cotton Vita Cotton Coco in white with a crochet. Schemes are attached (taken from the Internet). The dress is made with a large number of regions and rushes. Schemes

This dress is done on 32 wedges, rapports 7 loops. Retailing in the coquette in every 5 row, in the coquette 25 rows. Next, division on before, ass and back. Split like this: 10 wedges on before

Dress is associated with crochet based on the work of Vanessa Montoro "Beautiful Epoch". The author Olesya Petrova. Threads chose Yan Art Begonia, hook - 1.5.2, left 600g to size 48, scheme from the Internet. The dress is very simply connected and has 7 rapports. TO

The dress is connected by the motives of the "summer dreams" from Anna Costroov, the scheme took on the Internet from Lora. Knit from Anna 14 100% mercerized long-fiber cotton, 450 m in 100 gr., Hook 1.5. Dress knitting diagram:

Good day! I present to your attention my new job. The dress is connected under a specific person - from here and color gamut. Threads used Violet Yarnart and Cotonaks Eve. The work also used a cord - a caterpillar and a snail cord. Approximate

Summer dress "Snowflowers", connected to the technique of Irish lace of cotton and viscose yarn. The mesh is made of a thinner thread than motifs. Finishing - glass beads and rhinestones. Size 50-52. Dress knitting diagrams:

Dress knitted with knitting needles and crochet. For knitting this dress, anne 16 yarn 16 yarn yarn was used from SEAM, knitting needles No. 2 and 1.5 hook. Before you begin knitting, you must remove the measurements and build a pattern in a natural value. Dress Description: Liftics:

Dress "goddess". The dress is connected below the knee. Made of 100% Flax Semenovskaya Yarn "Olesya" Hook No. 1.3. Associated with horizontal stripes from various patterns with ryushkami separation. Ryushki is made by the "shell" pattern and are linked with a pattern "rachy". You can

The product is connected in the filleic technique of knitting from Turkish cotton crochet. Size 48-50, height 155. Yarn "Eva" Turkish production Metrah yarn 565 grams on the dress went 400 grams. The work of Alla. Dress "Flowers of white roses." Love here in every

Openwork summer dress is associated with crocheted separate squares. For knitting such a dress, you can use any square motifs, for example, such as in the diagram. I did not bind the edges of the motifs in the finished product. Original short sleeves

Rose dress. Connected in the fillet technology. Threads FILO DI SCOZIA N8, 100% cotton. At 58, the size was gone 650g. Motion 50g-340m. Hook №1.3. When passed to the drawing "spiders", then reduced the loops, because moving from the fillet

Dress "Shortart Heart" from Italian Cotton Anna is crocheted 1.5. Elegant evening dress of the tight silhouette, length in half-150cm. Under the dress is recommended lining for the entire length. Thread consumption 1kg. Dress Knitting Schemes: Pattern Scheme Between Hearters: Strip Connection Scheme: Scheme

Dress "Golden Sands" Author's work. Tied with crochet number 1.5 from Semenov yarn "Tenderness" - in 100 gr. 400m. 47% cotton, 53% viscose. The dress is connected with motifs (the scheme of the motive is attached). Skirt is connected by lips. On side, hips, sleeves and down

Dress from my beloved yarn Alliance (65% - Len, 35% - bamboo, 420 meters per 100 grams) Pink colors for her husband's sister, size 50, connected by a very pretty motcher, easy to do, crochet 2.0-2.5. Motifs connected

Hello, dear my friends. At most recently, I finished work on this wonderful dress. I worked on him at all for a long time, in my opinion it knives it easily, the only thing, again, in my opinion, the difficulty is correct

Dress is associated with crochet clover number 2 and 2.25 of yarn Alliance (65% - flax, 35% - bamboo) for daughter-in-law Kati on size 46. In 100 grams of yarn of 420 meters, the flow rate was about 6 cross-blocks. Knitting Schemes Dresses: Photo

An elegant dress tiers is associated with a crochet of fine merserized cotton. Size 44. Used German Soso yarn, hook No. 2. Gigroscopic yarn, perfectly passes air. In the process, socks do not lose shine and brightness, retains a new look. Beautiful

Hello, dear friends. Introducing your dress. It looks very bright and fit very simple. I wear it no longer one season and it is very pleased with me. Line is better to use cotton or micrafibra. Great idea for summer)

Dress "Anthony" based on Vanessa Montoro in my performance. Related from cotton Vita Cotton Coco in white with a crochet. Schemes are attached (taken from the Internet). The dress is made with a large number of regions and rushes. Dress knitting diagrams:

Dress "Violet" is connected in the technique of Irish lace on the magazine mod 566 MK Valeeva A. Yarn 100% cotton "Violet", "Garden 10", "Iris Atlas". Turkey production yarn. Dress description: First, the dress pattern is made, attached on the tablet (from the foam rubber

The dresses are crocheted in the technique of ribbon lace from the merserized cotton. Elegant neckline and a similar cutout on the back will not leave you unnoticed. The neckline can be adjusted with strings. Hem dresses asymmetrical. Thread consumption 700g. Size 50. More detailed description

Work Lily Escabar. I want to show my new work performed in the Irish technique (coupling) lace. Azalea yarn is used, COSO, chamomile, on mesh-canaris, hooks 1.1, 0.75. Long dress for the summer evening or solemn cases. Size 52-54, by

Dress is hooked, threshing children's cotton, hook 1.5. First tied the bod of dresses, from the bodice down knitted the dress to the desired length (scheme - shells), in the penultimate stage, the openwork back, the scheme - the ribbon lace, last

Author's dress Milena. Hook the first two photos from Alpina Sati (mercerized cotton), hook 1.5, brown color of the Alpina Ksenia. Dress in photo 3 and 4 of baby cotton. Motive Scheme for Dress:

Sati dress. A long dress is associated with a crochet of mercerized cotton Vita Coco, milk color, hook 1.5. I attach several schemes that took advantage. Dress knitting diagrams:

Wonderful dress "Hearts" based on Vanessa Montoro. Crocheted №2 and 2.5. Thread took Soso, Narcissus, it is possible an artificial school to take - the dress will be more elegantly and spectacularly look. Schemes found on the expanses of the Internet. Lining sewit

Openwork dress "Turquoise" is associated from Turkish cotton "Conex Eve" 100 gr / 900m., Hook №1.0. Dress size - 48, yarn flow 300 gr. Associated in a circle without seams. Dress is connected for younger sister. It was easily knitted, the result is satisfied. Openwork

) There are wishes to tie it
Therefore, I propose to start!
Girls, I immediately lay out the whole process, since the knitting speed is different.

To start, here is the original dresses that deprived me of peace in two color versions


With a debt and stubborn looking at these dresses, I realized that they differ slightly from each other. When selecting schemes, something took something from one dress, something from the other.

About yarn.
Girls who knit from pure silk or viscose, remember this yarn in the product stretches very much (herself did not knit from pure viscose, but read a lot); Even the statements of such a plan came across: "Midi came out in the morning, I came home in the evening in the evening. Therefore, let the dress initially will be short-sized, we pull it out when washing-dry.
Mixed types of yarn (for example, cotton viscose) or pure cotton, do not possess such properties.
These circumstances must be taken into account.

I knit from SEAM EXCLUSIVE Premium Silk 185m / 50g yarn. Total passed 400g.

The expansion of the petition dresses occurs due to an increase in the number of hearts in the row.
Coquette - 8 hearts
under the breast, waist (2, 3 bands from above) - 6 hearts
The remaining 3 bands - 7 hearts
Top 3 bands - hook №2,5; Lower 3 - hook number 3.
The strips are combined in a checker order, with the exception of 3-4 bands, since the number of hearts increases in 4 lane.
Initially, the scheme was when knitting samples. In the process of knitting the dress something has changed a little. At first, I wanted to redraw the schemes, but then I refused this idea (so that there were no discrepancies between the schemes and photos of the samples), simply made marks about the changes in the text of the description.
Hearts knitted this scheme, but with its changes.

1. Instead of air loops, we immediately make a set row from columns with Nakud (it will be the front side).

Next knit according to the scheme to the third row.
2. The third row - without turning the work! 3 in. p. Lifting, a column without a Nakid between 27 and 28 by the columns of the first row; Turn the work on persons. side, column with Nakida in the last column of the previous row, 2 columns with Nakud in the arch of the previous series; Continue according to the scheme. In the last arch, knit 2 SSN, 1 SSN in the third of the base of the air loop of the previous row, 1 SSN again into the arch, the connecting column in the column without a Nakid (which knit between 27 and 28 by the first row columns).

3. We put hearts in half, connecting columns from the wrong side we associate the heart loss (10 columns); We deploy the heart face to yourself and knit 3 ss in the columns with the left part of the heart, 2 failures, pico, 3 fails, pico, etc. (total should turn out 25 pico on the perimeter of the heart).







4. Pico closure for the front half a column without Nakid.

5. Hearts combine 4, 5, 6, 7 pico; 4, 7 - columns with 2 nakida, 5.6 - bars with 1 nakid.
6. After the 25th Pico, knit 3 fails, the SS into the remaining columns, the SS in the first SS series.

Connection of bands
Stripes connect according to the scheme



I want to pay attention to the fact that the connecting rods I knit is very weak (so that the dress is from what to reach)

Yoke
Kheetka knit according to this scheme

But there are changes.
In the process of knitting the diagram of the connection of the hearts in the coquette slightly adjusted.
So, the first row of Veter: Attach the thread according to the scheme, then 2 VP, SS in the nearest pico of the right heart, 1 VP, then according to the 6ss scheme
In the second circular row: in the chart of columns with Caid \u003d knit columns with 2 nakidami; Columns with 2 Caides \u003d knit columns with 3 nakida.
Be sure! Stumps knit in the loop of the previous row, and not in the arch.



The top of the coquettes are tied up according to the scheme.

I binds spandex in the second row.

Connection of the upper two strips
The center of the coquette is a fan between the hearts.
We have the first two round rows in the coquetki, the third is connecting with the second strip. In the same row we form the transition to the sleeves.
As I expected the sleeves: the pins first from the center of passing the first and second stripes in accordance with the diagram. The same procedure repeated from the center of the back to the sides. As a result, the bokes formed.



Compound of bands when expanding the hem.
We connect the band connections, only: each fan is connected to the heart pico (do not forget to initially place the bands so that the hearts are in front of the heart).
You can use this principle:
The easiest way is to be initially combined with pins or markers of the place of future tape connections, evenly distributing them on the ribbons.
Originally connect the ribbons with a marker in the place where you will have before, so that the hearts are located clearly in the chess. Then connect the ribbons among themselves in opposite places of ribbons. So you will get the setting of the connection and setting. Then the distances between the front and rear divide are exactly in half and connect in these places the ribbon markers - connected the sides. Gradually, by dividing segments of ribbons in half connect ribbons with markers among themselves. When knitting the connecting rod, connect the ribbons in places with markers (pins)
As a result, it turns out that in front of our hearts are located clearly in a checker order, and on the parties to the sides are gradually displaced.

Sleeve. Hook number 23.
Knit fan by the connection scheme of the bands.
The armpit has its own characteristics. In the first row: CC2H with the peak of the nearest heart, CC2H in the head of the heart, 1vP, CC2N in the heart, CC2H in the pico of the heart. In the second row between the CC2H (where there is a VP), I have a fan.

Knit five rows of fans (fifth - connecting with the next ribbon hearts). In each row of 14 fans. Fan: 2 patent columns, 1VP, 2 patent patelters.
The first and second strip of sleeves are connected by one near the fans; Between the second and third - three rows.
On the sleeves in the upper two bands of the heart are located in each other, the lower - in a checkerboard.

Well, do not forget to put the ruffles: 2VP, Pico from 3 VP, 2VP, SS (UBF). Ruffles can be made more (I was just afraid that the yarn is not enough). In which loops, we look at the clips on the photo.



The finished dress I was erased with my hands gently gently, dried horizontally. When laying, the hearts folded well and stretched the connecting rows. After drying, the dress "moved" to the shoulders.
The dress did not stroking.

Under the dress sewed a case of dual stretch

That's it seems to be all.


More photos of the process https://picasaweb.google.com/105057774415800477641/sjaltk?authkey\u003dgv1srgckqm3s7c-q2ikwe#

Let me remind you that the schemes (except the heart) I was invented myself, so there is a possibility that they differ slightly from the original. If anyone has additions to my schemes or your vision of patterns, share your ideas thoughts

Girls! Lay out photos of your work in this album


Do not forget to sign the name of the author, the name and consumption of yarn, hook numbers

On the Internet found options for our dress. They are very similar to mine, but maybe someone will like more.

This gorgeous dress knits with a crochet, rushes on a cover of contrasting color, so that all the splendor of the patterns can be seen. You can knit without difficulty unless the skirt, there is a simple pattern, the rapport of it vertically is only 1 row. The remaining patterns are not so accessible to understanding, experience and skill are required.

This means the following parameters:

Screens of Breast Figures - 86½-96½ (99-109, 112-122, 124½-134½) cm

Screens of chest in a knitted dress - 91½ (104, 118, 131) cm
- Dress length - 84 (84½, 85, 85½) cm

Patterns: CX2 for the main part; CX3 for coquetka; CX4 for individual nuances; CX1 for hooters.

Knitting density clarify, performing patterns:

According to SC3, we will knit 2 PT (loops) of the rapport for 8 rows \u003d 10 x 10 cm.

According to CX2, we will knit 7 PT of rapport for 8 rows \u003d 23 x 10 cm.

If you link 22 stlb / BN (babes without a nakid), then we get 10 cm.

Pattern dresses for all options

Description How to Knit Crocheted Summer Women's Dress from Openwork Patterns

Let's start knit from above, from the gate, and we will move down, performing the CRGR - circular rows. All Dress Fragments are performed in such a sequence:

Collar;

Yoke;

Main detail;

Skirt - all this is done continuously, one common detail.

And only the sleeves are drawn up after the dress is generally connected.

Collar

Knit chain from 156 (162, 172, 182) VP - air PT. They turn into a circle through the CST - the connecting column, and the first CRGR is performed by one stlb / BN.

1 VP; 1 stlb / BN in the first 13 pt; 2 stlb / BN knitted in a trace.

Knit 5 times (1 stlb / BN in 26 PT; 2 stlb / BN in the next)

1 stlb / BN in each VP to the end of the CRGR; 1 WST in 1st Stla / BN \u003d 168 Stlb / BN.

3 VP; 1 stlb / CH - a column with Nakida in a mark. 5 PT; 2 STLB / CH in a trail.

We perform 13 times (1 stlb / CH in the following.11 PT; 2 STLB / CH in 1. PT);

1 stlb / CH in each VP to the end of the CRGR; 1 WST in 3 VE from the beginning of the CRGR \u003d 186 Stlb / CH.

For 2x-Large / 3x-Large:

4 VP; 1 stlb / 2n - a column with 2 Nakida to the next 5 VP; 2 stlb / 2n knit in a trace.

We perform 15 times (1 stlb / 2n in next.10 PT; 2 STLB / 2N in next. 5 PT);

1 stlb / 2n in each PT to the end of the CRGR; 1 WST in the 4th VE from the beginning of the CRGR \u003d 198 STLB / 2N.

The 1st CRGR should start from the underlishes of the sleeve for which the PT should be skipped in a certain amount, in accordance with the SC2 scheme. It will take 6 circles to the main detail, then the skirt goes.

1st CRGR Skirts:

6 VP; 1 STLB / 2N in the same PT is the first V-PT;

Small V-PT is performed in the next. Claster;

- * High V-PT in a trace. Wallb / BN; Small V-PT in the next. Claster *; Repeat * - * according to the CRG;

CST in 4 VE from the beginning of the CRGR \u003d 28 (32, 36, 40) V-PT small and 28 (32, 36, 40) V-PT high.

2nd CRGR Skirts:

Knit in the 1st arch of their 2-VP group (CST; 6 VP; 1 STLB / 2N) - this is the first high V-PT;

Small V-PT fit in a mark. Arch of the 2-wt regular small V-PT;

- * V-PT high in a trace of the 2nd VP regular high V-PT;

V-Fri Small in a mark. Arch of 2 VP regular small V-PT *;

Repeat * - * according to CRGs to the end, 1 WST in the 4th VE from the beginning of the CRGR.

This 2nd CRGC repeat all the time, until the length of the skirt is 62 cm, if measured from the 1st CDR.

Last CRGR:

Knit in the 1st arch of the 2nd VP group (CST 1 VP; STLB / BN); 1 stlb / BN in the next 3 stlb / 2n;

Knit into the trail arch (1 stlb / BN; 2 VP; 1 STLB / BN); 1 stlb / BN in the next 3 stlb / 2n the same V-PT small;

- * 1 Stlb / BN in a mark. 1 stlb / BN knit in the first 3 stlb / 2n another V-PT;

In its arch, we perform a group (1 stlb / BN; 2 VP; 1 STLB / BN); 1 stlb / BN in the next 3 stlb / 2n of the same V-PT *;

Repeat * - * according to CRGs to the end, 1 WST in the 1st Stlb / BN.

Thread cut off.

The dress is over, it remains to carry the sleeves. We do it according to CX1, start from the cutter.

A total of 12 (12, 13, 13) clusters should be placed, each of which consists of three stlb / 2n and 12 (12, 13, 13) of Stlb / BN.

In the second CRGR, we carry out the WST in the last arch of the 6th VP of the previous series. Knitting turn, perform 1 VP, and begin to knit into the same arch, moving in accordance with CX1.

Make 6 CRGR, the last CRGR is performed in the same way as for the skirt.